Selecting A Power Supply Configuration; Figure 5-40 Agilent E6178B 8-Channel Heavy Duty Load Card Layout - Agilent Technologies E6198B User Manual

Functional test system switch/load unit
Table of Contents

Advertisement

5
Using Load Cards and Loads

Figure 5-40 Agilent E6178B 8-Channel Heavy Duty Load Card Layout

F1
J31
CH1
F2
CH2
J32
J33
F3
CH3
J34
CH4
F4
J300
NC
F5
J102
NC
J35
CH5
F6
J36
CH6
J37
F7
CH7
CH8
J38
F8
CH1
J11
CH2
J12
K1
J13
CH3
J14
CH4
NC
J100
NC
J301
CH5
J15
CH6
J16
CH7
J17
CH8
J18

Selecting a Power Supply Configuration

5-56
U1
U2
U3
U5
U6
U7
RV1
RV2
RV3
RV4
K2
K3
K4
As shown in
loads are through P100 and P200 to PWR1 and PWR2 (J41)
respectively. You must wire the power supply connectors to the
individual channel connectors CH1 through CH8 (J101, J103,
J105, and J107). Use at least a 14 AWG PTFE insulated or 12
AWG vinyl insulated wire to carry 30 Amperes.
<Blue>Figure shows one possible power supply configuration.
In this configuration, Channel 1 is configured for a single load
connected to V+. Load 8 would be a short to provide a path
return. Channels 2 and 3 are connected as a bridge load; a load
that is "floating" with respect to the power system.
Other configurations are possible. For example, the negative
terminals of two external power supplies could be connected
together at the UUT and the positive terminals could be
connected to P100 and P200 (respectively) and distributed to
the individual channels. This would provide two simultaneous
power supply connections to the UUT or multiple UUTs.
CH1
CH2
CH3
CH4
U4
CH5
CH6
CH7
CH8
U8
PWR1
PWR2
RV5
RV6
RV7
RV8
K5
K6
K7
Figure
5-39, power supply connections for the
P3
SW1
K8
E6198B Switch/Load Unit User Manual
P1
PWR1 .
P100
P200
PWR2 .
P21
CH1 .
P22
CH2 .
P23
CH3 .
P2
P24
CH4
CH5
P25
CH6
P26
P27
CH7
P28
CH8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ts-5000

Table of Contents