Maintenance - Teledyne 7300A Operating Instructions Manual

Infrared gas analyzer
Table of Contents

Advertisement

Infrared Gas Analyzer
Aside from normal cleaning and checking for leaks at the gas connec-
tions, routine maintenance is limited to replacing filter elements and fuses,
and recalibration.
WARNING: SEE WARNINGS ON THE TITLE PAGE OF THIS
5.0
Remove Power to Unit before replacing the
fuse.
1. Place small screwdriver in notch, and pry cover off, as shown in
Figure 5-1.
2. To change between American and European fuses, remove the
single retaining screw, flip Fuse Block over 180 degrees, and
replace screw.
3. Replace fuse as shown in Figure 5-2.

5.0 Maintenance

MANUAL.
Replacing the Fuse
Figure 5-1: Removing Fuse Block from Housing
Teledyne Analytical Instruments
Maintenance 5
5-1

Advertisement

Table of Contents
loading

Table of Contents