Teledyne IR7000 Operating Instructions Manual page 15

Ndir gas analyzer
Table of Contents

Advertisement

NDIR Gas Analyzer
Input Buttons—4 push buttons are installed on the front panel
and are used to enter data and set operational modes.
Flowmeter—an integral flowmeter is mounted on the front
panel for monitoring the sample flow through the instrument.
Power Switch—an off/on switch is mounted on the front panel
for powering up the instrument.
Sample Pump Switch (IR7000P only)—this switch controls
the operation of the sample pump on portable models.
Sample Pump Connector (IR7000P only)—a quick
disconnect nylon fitting is mounted on the front panel of
portable models for attaching the sample probe to the
instrument.
.
Teledyne Analytical Instruments., - Rev. 3
Introduction 1
7

Advertisement

Table of Contents
loading

Table of Contents