Service And Adjustments; Discharge Chute; Scraper Blade; Shear Bolts - Ariens Sno-Thro 932036-524 Owner's Manual

Table of Contents

Advertisement

Available languages

Available languages

,t_
WARNING: AVOID INJURY. Read
and understand the entire Safety
section before proceeding.
DISCHARGE CHUTE DEFLECTOR
Deflector must stay in selected position while
throwing snow.
To adjust, loosen then retighten hardware to
desired deflector drag force (Figure 11).
Adjusting
Hardware
Discharge Chute
Deflector
Figure 11
©S0113
DISCHARGE CHUTE
If chute does not stay in position while
operating, tighten nut on carriage bolt at pivot
)oint to increase tension on spring (Figure 12).
2 3
4
OS0115
1. Pinion
2. Chute Gear
3. Carriage Bolt
4. Spring
Figure 12
RUNNERS
Runners should be adjusted as conditions
require (Figure 13).
1. Position unit on a hard, flat, smooth level
surface.
2. Adjust runners by inserting a spacer of
desired thickness under center of scraper
blade, loosen runner hardware, slide
runners to flat surface. Allow 1/8 in.
(3 mm) between scraper blade and hard
smooth surfaces. Allow 1-1/4 in. (30 mm)
between scraper blade and uneven or
gravel surfaces. Retighten hardware.
NOTE: Keep housing level by adjusting
runners equally.
1
1. Runner
2. Runner Hardware
OS0486
Figure 13
SCRAPER BLADE
IMPORTANT: Damage to auger/impeller
housing will result if blade wears down too far.
Scraper blade is adjustable to compensate
for
wear.
To adjust scraper blade:
1. Tip unit back onto handlebar, support
housing and loosen nuts retaining blade.
2. Adjust runners to fully raised position
(housing closest to ground).
3. Reposition scraper blade flush with
runners and tighten lock nuts.
SHEAR BOLTS
IMPORTANT:
Use only Ariens shear bolts for
replacement.
Use of any other type of shear
bolt may result in severe damage to unit.
Occasionally
a foreign object may enter the
auger/impeller
housing and jam the auger,
breaking shear bolts (Figure 14) which secure
the auger to the shaft. This allows auger to
turn freely on the shaft preventing damage to
gear drive.
For Replacement:
1. Slide auger outward against roll pin and
align hole in shaft with hole in auger
(holes in shaft for roll pins and shear bolts
line up).
GB - 20

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Sno-thro 932037-724Sno-thro 932504-524932505-724Sno-throo 932505-724Sno-throo 932037-724Sno-throo 932504-524 ... Show all

Table of Contents