Hitachi XP P9500 User Manual page 116

Hitachi dynamic link manager software user guide for windows (6.6) (hit5201-96006, november 2011)
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

KAPL01001-I The HDLM command completed normally. Operation name
= view, completion time = yyyy/mm/dd hh:mm:ss
22
Use the results of the dlnkmgr command's view operation to check the
.
version of the installed HDLM.
If x.x.x-xx is displayed in HDLM Version, the correct version of HDLM
has been installed.
23
Use the results of the dlnkmgr command's view operation to check that
.
the programs are running properly.
If HDLM Manager, HDLM Alert Driver, and HDLM Driver are all Alive, all
the programs are running correctly.
24
After the installation finishes, check the path information as described in
.
Checking the Path Configuration on page
have successfully installed HDLM in a single-path configuration.
25
Connect cables to all the HBAs to change the configuration to a multi-path
.
configuration.
26
Check the path information as described in
.
Configuration on page 3-68
assembled a multi-path configuration.
27
Shut down the host.
.
28
On all the hosts that make up the cluster system, perform steps 19 to 27.
.
29
Install and configure Oracle RAC.
.
If both of the following conditions are satisfied, you must change the
Oracle RAC settings after assembling the environment.
¢
¢
For details, see
30
Make sure that the program is running properly, by examining the results
.
of the dlnkmgr command's view operation.
An example of executing the dlnkmgr command's view operation is as
follows:
>dlnkmgr view -sys
HDLM Version
Service Pack Version
Load Balance
Support Cluster
Elog Level
Elog File Size (KB)
Number Of Elog Files
Trace Level
Trace File Size(KB)
Number Of Trace Files
Path Health Checking
Auto Failback
Remove LU
Intermittent Error Monitor
HDLM Manager Ver
Alive
3-50
Oracle RAC 10g 10.1.0.3.0 or later or Oracle RAC 11g is used.
A host is connected to a voting disk via multiple paths in an FC-SAN
environment.
Notes on Creating an HDLM Environment on page
x.x.x-xx
Creating an HDLM Environment
Hitachi Dynamic Link Manager User Guide (for Windows(R))
3-68, and make sure that you
Checking the Path
to make sure that you have successfully
: x.x.x-xx
:
: on(extended lio)
: off
: 3
: 9900
: 2
: 0
: 1000
: 4
: on(30)
: on(1)
: off
: off
WakeupTime
yyyy/mm/dd hh:mm:ss
3-14.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dynamic link manager

Table of Contents