Switch Rear View - Enterasys SecureStack B2 B2G124-24 Hardware Installation Manual

Gigabit and fast ethernet switches
Table of Contents

Advertisement

Connecting AC and RPS-SYS Power
Figure 3-8
1 AC power cord
3.
Observe that the power CPU LED (not shown), located on the front panel. During the 
initialization, the CPU LED will start by illuminating solid amber, then start blinking 
green, then blinking amber, then blinking green again until the end of the 
initialization, and then turns solid green. 
If the switch is a standalone switch, it will take approximately 30 seconds for the 
switch to start up. If the switch is a stack Manager, it can take up to 3 minutes or more 
to start up, depending on the number of Member switches in the stack.
3-16 Hardware Installation

Switch Rear View

Á
À
2 AC power connector
Note: If the CPU LED illuminates solid red, there was a critical failure. For more
information about the LED indications and troubleshooting, refer to
additional help, contact Enterasys Networks. Refer to
details
.
Â
3 Connector for external redundant power supply
"Getting
Chapter
4. If you need
Help" on page 1-8 for

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents