Diffuser Control - Carrier 19XRV Start-Up, Operation And Maintenance Instructions Manual

Hermetic centrifugal liquid chillers with pic iii controls 50/60 hz hfc-134a
Table of Contents

Advertisement

CONTENTS
Page
Check Relief Valves .............................
58
Identify the VFD .................................
58
Input Power Wiring ..............................
59
Checking the Installation ........................
59
Inspect Wiring ...................................
60
Ground Fault Troubleshooting
..................
60
Carrier Comfort Network Interface ...............
60
Power Up the Controls
and
Check the Oil Heater ..........................
61
• SOFTWARE VERSION
Software
Configuration
.........................
61
Input the Design Set Points .....................
61
Input the Local Occupied
Schedule
(OCCPC01S)
..................................
61
Input Service
Configurations
....................
61
• PASSWORD
• INPUT TIME AND DATE
• CHANGE ICVC CONFIGURATION
IF NECESSARY
• TO CHANGE THE PASSWORD
• TO CHANGE THE ICVC DISPLAY FROM
ENGLISH TO METRIC UNITS
• CHANGE LANGUAGE
• MODIFY CONTROLLER IDENTIFICATION
IF NECESSARY
• INPUT EQUIPMENT SERVICE PARAMETERS
IF NECESSARY
• VERIFY VFD CONFIGURATION AND CHANGE
PARAMETERS IF NECESSARY
• VFD CHILLER FIELD SET UP AND VERIFICATION
• CONFIGURE DIFFUSER CONTROL IF
NECESSARY
• MODIFY EQUIPMENT CONFIGURATION
IF NECESSARY
Perform a Control Test ..........................
64
• PRESSURE TRANSDUCER CALIBRATION
Check Optional
Pumpout System
Controls and Compressor .....................
65
High Altitude Locations .........................
65
Charge Refrigerant
Into Chiller ..................
65
• CHILLER EQUALIZATION WITHOUT A
PUMPOUT UNIT
• CHILLER EQUALIZATION WITH
PUMPOUT UNIT
• TRIMMING REFRIGERANT CHARGE
INITIAL START-UP .............................
67,68
Preparation
.....................................
67
Check
Motor Rotation
...........................
67
Check Oil Pressure and Compressor
Stop ......
67
To Prevent Accidental
Start-Up ..................
67
Check Chiller Operating
Condition
..............
68
Instruct
the Customer
Operator .................
68
• COOLER-CONDENSER
• OPTIONAL PUMPOUT STORAGE TANK AND
PUMPOUT SYSTEM
• MOTOR COMPRESSOR ASSEMBLY
• MOTOR COMPRESSOR
LUBRICATION SYSTEM
• CONTROL SYSTEM
• AUXILIARY EQUIPMENT
• DESCRIBE CHILLER CYCLES
• REVIEW MAINTENANCE
• SAFETY DEVICES AND PROCEDURES
• CHECK OPERATOR KNOWLEDGE
• REVIEW THE START-UR OPERATION, AND
MAINTENANCE
MANUAL
(cont)
Page
OPERATING
INSTRUCTIONS
.................
68-70
Operator
Duties
.................................
68
Prepare
the Chiller for Start-Up
.................
68
To Start the Chiller ..............................
68
Check the Running
System
.....................
68
To Stop the Chiller
..............................
69
After Limited
Shutdown
.........................
69
Preparation
for Extended
Shutdown
............
69
After Extended
Shutdown
.......................
69
Cold Weather
Operation
.........................
69
Manual
Guide Vane Operation
...................
69
Refrigeration
Log ...............................
69
PUMPOUT AND REFRIGERANT TRANSFER
PROCEDURES .............................
71-74
Preparation .....................................
71
Operating
the Optional
Pumpout
Unit ...........
71
• TO READ REFRIGERANT PRESSURES
• POSITIVE PRESSURE CHILLERS WITH
STORAGE TANKS
• CHILLERS WITH ISOLATION VALVES
• DISTILLING THE REFRIGERANT
GENERAL
MAINTENANCE
....................
74,75
Refrigerant
Properties
..........................
74
Adding
Refrigerant
..............................
74
Removing
Refrigerant
...........................
74
Adjusting
the Refrigerant
Charge
...............
74
Refrigerant
Leak Testing
........................
74
Leak Rate .......................................
74
Test After Service,
Repair, or Major Leak ........
74
• TESTING WITH REFRIGERANT TRACER
• TESTING WITHOUT REFRIGERANT TRACER
• TO PRESSURIZE WITH DRY NITROGEN
Repair the Leak, Retest, and Apply
Standing
Vacuum Test ........................
75
Checking
Guide Vane Linkage
..................
75
Trim Refrigerant Charge .........................
75
WEEKLY MAINTENANCE ........................
75
Check the Lubrication
System
..................
75
SCHEDULED
MAINTENANCE
................
75-78
Service Ontime ..................................
75
Inspect the Control Panel .......................
76
Check Safety and Operating
Controls
Monthly .......................................
76
Changing
Oil Filter ..............................
76
Oil Specification
................................
76
Oil Changes .....................................
76
• TO CHANGE THE OIL
Refrigerant
Filter ................................
76
Oil Reclaim
Filter ................................
76
VFD Refrigerant
Strainer
........................
77
Inspect
Refrigerant
Float System
...............
77
Inspect
Relief Valves and Piping
................
77
Compressor
Bearing and Gear
Maintenance ..................................
77
Inspect the Heat Exchanger
Tubes
and Flow Devices .............................
77
• COOLER AND OPTIONAL FLOW DEVICES
• CONDENSER AND OPTIONAL FLOW DEVICES
Water Leaks .....................................
77
Water Treatment .................................
78
Inspect the VFD .................................
78
Recalibrate
Pressure Transducers
..............
78

Advertisement

Table of Contents
loading

Table of Contents