Junction Box Wiring Installation Instructions; Fbb4 Variable Speed Blower Installation - Empire Comfort Systems DVX36DP31(N,P)-1 Installation Instructions And Owner's Manual

Studio series direct vent zero clearance gas fireplace heater
Table of Contents

Advertisement

FBB4 VARIABLE SPEED BLOWER INSTALLATION

JUNCTION BOX WIRING INSTALLATION INSTRUCTIONS

CAUTION: ALL WIRING SHOULD BE DONE BY A QUALIFIED ELECTRICIAN AND SHALL BE IN COMPLIANCE
WITH ALL LOCAL, CITY AND STATE BUILDING CODES. BEFORE MAKING THE ELECTRICAL CONNECTION,
MAKE SURE THAT MAIN POWER SUPPLY IS DISCONNECTED. THE APPLIANCE, WHEN INSTALLED, MUST BE
ELECTRICALLY GROUNDED IN ACCORDANCE WITH LOCAL CODES OR, IN THE ABSENCE OF LOCAL CODES,
WITH THE NATIONAL ELECTRICAL CODE ANSI/NFPA 70 (LATEST EDITION).
A factory installed junction box is located on the lower right
side of the fireplace. Wiring must be fed to the junction box and
attached to the receptacle that is provided. Leave approximately
6" of wire in the junction box for connection.
Attach black wire to one side of the receptacle and white wire to
opposite side of receptacle. The ground wire should be attached
to the green (ground) screw.
Install the receptacle into the junction box. Attach cover plate.
Page 66
JUNCTION BOX
FAN
BLACK
FAN
SWITCH
WHITE
SPEED
CONTROL
1
FBB4
B L O W E R A S S E M B LY
COMPLETE
2
R7649
FAN CONTROL
3
R4192
SPEED CONTROL KNOB
4
R4186
SPEED CONTROL
110 VOLT AC
GROUND
Figure 76
25613-0-0309

Advertisement

Table of Contents
loading

Table of Contents