Ni Bri Provisioning Test Errors - AT&T MERLIN LEGEND Release 3.1 Maintenance And Troubleshooting Manual

Communications system
Hide thumbs Also See for MERLIN LEGEND Release 3.1:
Table of Contents

Advertisement

800 NI-BRI Module Problems
Table 4–6. NI BRI Provisioning Test Errors
Error Messages
Console Display/Instructions
5 Observe the status screens below.
The screen below appears while the test is running.
While the test is running, the LEDs are in the following states:
GREEN:
GREEN:
YELLOW:
YELLOW:
RED:
RED:
4–78
Control Unit Problems
Corrective Action
Exit the test, busy-out the slot, and try again.
Exit the test and try again. Be sure to type the correct slot
number; do not indicate an empty slot or the processor (00).
If the problem persists, replace the 800 NI-BRI module.
Exit the test. Remove half of the DSL connectors and rerun
the test. Note the result codes of those that fail and then
disconnect them. Reconnect the untested DSLs and rerun
the test. Note those that fail. Reconnect all DSLs.
Additional Information
xx =slot number entered in Step 2

Blinks to indicate the test is running.
Flashes on and off while calls are being established
and disconnected.
Stays on until Layers 1–3 are initialized for all
administered communication paths on the module.
PC

Advertisement

Table of Contents
loading

This manual is also suitable for:

Merlin legend 4.0

Table of Contents