Installing The Server Into The Rack - HP DL360 - ProLiant - G3 Setup And Installation Manual

Hp proliant dl360 generation 3 server setup and installation guide
Hide thumbs Also See for DL360 - ProLiant - G3:
Table of Contents

Advertisement

Installing the Server into the Rack

CAUTION: To avoid destabilizing the rack, install multiple servers starting from the
bottom of the rack.
CAUTION: Always mount the heaviest item on the bottom of the rack, and work
from the bottom to the top.
To install the server into the rack:
1. Align the rear end of the fixed server rails (1), with the front end of the universal
rack rails (2).
WARNING: The rail release latches can pinch your fingertips.
2. Press the rail release latches and slowly slide the server into the rack.
Figure 3-4: Aligning the rear end of the fixed server rails
with the front end of the universal rack rails
HP ProLiant DL360 Generation 3 Server Setup and Installation Guide
Server Installation
3-5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant dl360 g3

Table of Contents