Setting Up A Tower Server; Installing The Server Into The Rack - HP ProLiant ML350 Generation 4p User Manual

Hide thumbs Also See for ProLiant ML350 Generation 4p:
Table of Contents

Advertisement

Setting up a Tower Server

Follow the steps in this section to set up a tower model server. If you are going to
install the server into a rack, refer to the rack installation ("Installing the Server
into the Rack" on page 37) section.
1. Connect peripheral devices to the server ("Rear Panel Components" on page
12).
2. Connect the power cord to the back of the server.
3. Connect the power cord to the AC power source.

Installing the Server into the Rack

Follow the steps in this section to install the server into either a round-hole or
square-hole rack.
WARNING: To reduce the risk of electric shock, fire, or
damage to the equipment, do not plug telephone or
telecommunications connectors into RJ-45 connectors.
IMPORTANT: If the RILOE II board is installed in the server, be sure
that you attach the video cable to the video connector on the rear of the
RILOE II board. The standard video connector on the server rear panel
is not used when the RILOE II board is installed. For more information,
refer to the HP Remote Insight Lights-Out Edition II User Guide.
WARNING: To reduce the risk of electric shock or damage
to the equipment:
Do not disable the power cord grounding plug. The grounding
plug is an important safety feature.
Plug the power cord into a grounded (earthed) electrical outlet
that is easily accessible at all times.
Unplug the power cord from the power supply to disconnect
power to the equipment.
Do not route the power cord where it can be walked on or
pinched by items placed against it. Pay particular attention to
the plug, electrical outlet, and the point where the cord extends
from the server.
Server Setup
37

Advertisement

Table of Contents
loading

Table of Contents