Hardware Installations and Upgrades
11. Push drive latch in to lock hard drive into drive bay
12. Install additional drives as necessary.
Warning: Drive bay slots 1, 3, and 5 MUST be populated first. Failure to do so could result in
thermal issues within the chassis.
30
Figure 30. Latching Drive Latch
1
2
3
4
5
6
Figure 31. Drive Bay Slot Order
Intel® Entry Server Chassis SC5299-E UP/DP/WS/BRP User Guide
AF000320
AF000316