Installing The Switch; Selecting A Site - SMC Networks SMCGS10P-SMART Installation Manual

Ez switch 10/100/1000 web smart 10-port gigabit ethernet poe switch
Hide thumbs Also See for SMCGS10P-SMART:
Table of Contents

Advertisement

3
I
This chapter describes how to install the switch.
S
ELECTING A
The site should:
be at the center of all the devices you want to link and near a power
outlet.
be able to maintain its temperature within 0 to 50 °C (32 to 122 °F)
and its humidity within 10% to 90%, non-condensing
provide adequate space (approximately two inches) on all sides for
proper air flow
be accessible for installing, cabling and maintaining the devices
allow the status LEDs to be clearly visible
Make sure twisted-pair cable is always routed away from power lines,
fluorescent lighting fixtures and other sources of electrical interference,
such as radios and transmitters.
Make sure that the unit is connected to a separate grounded power outlet
that provides 100 to 240 VAC, 50 to 60 Hz, is within 2 m (6.6 feet) of each
device and is powered from an independent circuit breaker. As with any
equipment, using a filter or surge suppressor is recommended.
NSTALLING THE
S
ITE
S
WITCH
– 36 –

Advertisement

Table of Contents
loading

Table of Contents