Mounting; Rack-Mounting; Figure 13: Grounding - SMC Networks SMCGS10P-SMART Installation Manual

Ez switch 10/100/1000 web smart 10-port gigabit ethernet poe switch
Hide thumbs Also See for SMCGS10P-SMART:
Table of Contents

Advertisement

| Installing the Switch
C
3
HAPTER

Mounting

M
OUNTING
The switch can be mounted in a standard 19-inch equipment rack or on a
desktop or shelf. Mounting instructions for each type of site follow.
R
-M
ACK
OUNTING
Before rack mounting the switch, pay particular attention to the following
factors:
Temperature: Since the temperature within a rack assembly may be higher
than the ambient room temperature, check that the rack-environment
temperature is within the specified operating temperature range.
Characteristics" on page
Mechanical Loading: Do not place any equipment on top of the rack-
mounted unit.
Circuit Overloading: Be sure that the supply circuit to the rack assembly is
not overloaded.
Grounding: Rack-mounted equipment should be properly grounded.
Particular attention should be given to supply connections other than direct
connections to the mains.

Figure 13: Grounding

1.
Attach an insulated grounding
wire, with a metal screw, to
the marked grounding point.
54.)
2.
Terminate the wire in an
earthed grounding point.
– 39 –
("Physical

Advertisement

Table of Contents
loading

Table of Contents