removing (for card cage assembly
replacement)
removing (for frame installation)
removing (for replacement)
status LEDs
clock and scheduler card
description
1-27
removing (for replacement or card cage
assembly replacement)
description
1-25
lower card cage slots
minimum system configuration
switches
alarm card audible alarm reset
PRP soft reset (NMI) switch
soft reset
1-11
system
banner
4-6
booting for first time
clock
1-27
configuration mode
configuration register
configuration
settings at startup
configuration, basic
configuring global parameters
grounding
cable connection
description
2-15, 3-50
reattachment (after card cage
replacement)
removing
7-38
interfaces
3-30
lifting safely
2-3
packaging
components
installation
A-8
replacement product number
tools required
power
guidelines
2-11
12 Cisco 12012 Gigabit Switch Router Installation and Configuration Guide
7-38
3-13
7-45
1-28
7-45
1-25
1-27
1-24
1-21
4-7
4-20
4-24 to 4-31
4-26
4-8 to 4-21
4-9 to 4-15
3-51
7-41
A-1
A-1
A-2
specifications
privileged mode, EXEC
startup
4-3 to 4-7
startup preparation
unpacking
2-23
T
telco-style rack requirements
telephone jacks
2-5
temperature
sensors
1-36
specifications, system
thermal output, system
timesaver description
xxii
transmission recommendations, 100BASE-T
troubleshooting
additional references
checking the blower modules
cooling subsystem
damaged power cord
environmental shutdown
line card problems
power problems
5-4
processor subsystem
RP
5-10
startup problems
5-4
twisted-pair wiring
2-16
U
uninterruptible power source
See UPS
unpacking, system
2-23
upgrading
for redundancy
AC-input power
DC-input power
1-41
4-7
4-2
2-7
2-11
2-11
3-47
5-17
5-7
5-15
5-8
5-17
5-12
5-10
7-15
7-19, 7-25