Extreme Networks Summit Summit1i Hardware Installation Manual page 216

Consolidated i series
Hide thumbs Also See for Summit Summit1i:
Table of Contents

Advertisement

BlackDiamond 6800 Series Switch Power Supplies
• Mount the chassis in a rack—For more information about mounting the chassis, see "Installing the
Chassis" on page 203.
• Ground the chassis—For more information about grounding the chassis, see "Grounding the
BlackDiamond 6800 Series Chassis" on page 208.
To install a power supply:
1 Attach the ESD strap that is provided to your wrist and connect the metal end to the ground
receptacle that is located on the top-left corner of the switch front panel.
2 Ensure that the rack and chassis are grounded to protective earth ground.
For more information about grounding the rack, see "Protective Grounding for the Rack" on page 46.
For more information about grounding the chassis, see "Grounding the BlackDiamond 6800 Series
Chassis" on page 208.
3 If there is a blank faceplate covering the power supply bay, remove it and save it for future use.
4 Prepare the power supply for installation.
For the BlackDiamond 6816 switch, as shown in Figure 101:
• Ensure that the power supply is right side up
• Open the locking handle
For the BlackDiamond 6808 or Black Diamond 6804 switch, as shown in Figure 102:
• Ensure that the power supply is right side up
• Open the locking handle
216
Extreme Networks Consolidated "I" Series Hardware Installation Guide

Advertisement

Table of Contents
loading

Table of Contents