Recharge The Robot Lawn Mower After Installation; Programming Virtual Perimeters, Transition Routes And Areas To Be Avoided - Stiga A 500 Instruction Manual

Table of Contents

Advertisement

WARNING:
The surface or pole on which the satellite reference station is mounted must be
stable and not move, sway or rotate, e.g. under strong wind or adverse weather
conditions. The movement of the satellite reference station affects the operating
accuracy of the robot lawn mower.
WARNING:
When installing the satellite reference station, proceed with caution. There is a
risk of falling from considerable heights or of falling objects.
WARNING:
If the satellite reference station is moved, the virtual boundaries, transfer routes
and areas to be avoided must be reconfigured through the APP.
WARNING:
Make sure that the satellite reference station is installed in a perfectly horizontal
position.

4.5.3. RECHARGE THE ROBOT LAWN MOWER AFTER INSTALLATION

Please recharge the robot lawn mower before proceeding with the programming of virtual boundaries.
Requirements and obligations:
• charging base.
Procedure:
1. Recharge the robot lawn mower (See Par 5.5).
NOTE: When charged for the first time, the batteries must remain connected for at least 2 hours.
4.6.
PROGRAMMING VIRTUAL PERIMETERS, TRANSITION ROUTES AND AREAS TO BE
AVOIDED
The programming of the virtual perimeters, transition routes and areas to be avoided is performed using
the respective "STIGA.GO APP" wizards. The procedure requires you to guide the robot lawn mower
manually by walking alongside it according to the general instructions provided in Chap. 4.4.
Requirements and obligations:
• Android or iOS mobile device connected to the internet (not included).
36
4. INSTALLATION
EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

A 750A 1000A 1500A 3000A 5000A 7500 ... Show all

Table of Contents