Extreme Networks VSP 4900 Series Installation Manual page 98

Hide thumbs Also See for VSP 4900 Series:
Table of Contents

Advertisement

E
electric power
connecting to switch 52
electrical codes 30
, see ESD
electrostatic discharge
environmental requirements
building codes 30
electrical codes 30
electrostatic discharge (ESD) 33
humidity 33
temperature 32
wiring closet 31
equipment
installing 45
tools needed to install 46
equipment rack
grounding 34
mechanical recommendations 33
mounting holes 33
securing 34
service access 34
space requirements 34
ESD
discharge from cable 36
system protection 33
F
fan
airflow 68
replacing 68
fan speed
VSP 4900 switch 79
feedback 8
fiber optic cable
bend radius 37
connecting 52
handling 37
installing 37
first switch login 54
, see radio frequency interference (RFI)
frequency
front-to-back cooling 68
G
grounding
racks 34
requirements 44
wiring closet 31
H
humidity 33
I
industry standards 44
initial switch login 54
installing
1100 W AC power supply 50
2000 W AC power supply 50
715 W AC power supply 50
connecting power 52
fiber optic cable 37
optical transceivers 49, 50
optional components 49, 50
personnel 46
preparation 29
preparing 46
safety information 46
switches 45–47
tools 46
VIM module 56
J
jackets
RJ45 connector 41
L
labeling cables 35
LEDs
VIM5 74
VSP 4900 72, 73
license options 16
local management connection 54
logging in to the switch 54
M
management port
connecting to switch 54
settings 54
VSP 4900 series 11–13
mounting brackets
removing 59
N
network interface connections 52
notices 6
O
operating environment requirements 32
optical cables
installing 49, 50
optical transceivers
installing 49, 50
optional components
installing 49, 50
P
planning
site 29
Index

Advertisement

Table of Contents
loading

Table of Contents