Natural Gas Conversion - Jenn-Air JDRP548WP02 Installation Instructions Manual

30" (76.2 cm), 36" (91.4 cm) and 48" (121.9 cm) commercial style dual fuel convection ranges
Hide thumbs Also See for JDRP548WP02:
Table of Contents

Advertisement

Available languages

Available languages

Eg
Neoturol Gas
AWARNING
v
>
Tip Over Hazard
A child or adult can tip the range and be killed.
:
Connect anti-tip bracket to rear range foot.
E
D
Cc
Reconnect the anti-tip bracket, if the range is moved.
A. Access cap
D. NAT position
B. Gasket
E. LP position
Failure to follow these instructions can result in death
.
.
C. Gas pressure regulator
or serious burns to children and adults.
3.
Test the gas pressure regulator and gas supply line.
The regulator must be checked at a minimum 1" (2.5 cm)
water column above the set pressure. The inlet pressure to
B
the regulator should be as follows for operation and checking
the regulator setting:
1.
Turn manual shutoff valve to the closed position.
Natural Gas:
SL
Minimum
pressure 6" (15.2 cm) WCP
os C
Maximum
pressure 14" (35.6 cm) WCP
Gas Supply Pressure Testing
A. To range
B. Shutoff valve (closed position)
C. Gas supply line
Gas supply pressure for testing regulator must be at least
1" water column pressure above the manifold pressure
shown on the model/serial rating plate.
2.
Unplug range or disconnect power.
Line pressure testing above '2 psi gauge (14" WCP)
The range and its individual shutoff valve must be
To Convert Gas Pressure Regulator
disconnected from the gas supply piping system during any
pressure testing of that system at test pressures in excess of
1.
Remove the access cap by using a wrench, turning the
Ve psi (3.5 kPa).
access cap counterclockwise.
.
.
.
.
Line pressure testing at 2 psi gauge (14" WCP) or lower
2.
Remove spring retainer from the cap by pushing against the
flat side of the spring retainer. Look at the spring retainer to
The range must be isolated from the gas supply piping
locate the "LP" or "NAT" position. Turn over the spring
system by closing its individual manual shutoff valve during
retainer so the "NAT" is showing on the bottom. Snap the
any pressure testing of the gas supply piping system at test
spring retainer back into the cap. Reinstall the cap onto the
pressures equal to or less than ¥ psi (8.5 kPa).
regulator.
19

Advertisement

Table of Contents
loading

Table of Contents