Section 2 Installing The Model 9100; About Section 2 - Fluke 9100 User Handbook Manual

Universal calibration system
Hide thumbs Also See for 9100:
Table of Contents

Advertisement

Section 2
Installing the Model 9100
2.1

About Section 2

Section 2 contains information and instructions for unpacking and installing the Model
9100 Universal Calibration System. It is divided into the following sub-sections:
2.2
Lifting and Carrying the Model 9100
2.3
Unpacking and Inspection
2.4
Storage
2.5
Preparation for Shipment
2.6
Calibration Enable Switch
2.7
Preparation for Operation
2.7.1 Power Input
2.7.2 Power Cable
2.7.3 Line Voltage
2.7.4 Power Fuse
2.7.5 Mounting
2.8
Connectors and Pin Designations
2.8.1 IEEE-488 Input/Output Socket J101
2.8.2 Parallel Port J103
2.8.3 Serial Port J102
2.8.4 Signal Output J109
2.8.5 Phase Lock Connections
2.8.6 'TRIG OUT' and 'SIG OUT' Connections
Section 2: Installing the Model 9100: About Section 2
Final Width = 215mm
2-1

Advertisement

Table of Contents
loading

Table of Contents