IBM 5225 1 Operator's Manual page 74

Table of Contents

Advertisement

Follow these steps to run the Test:
Attention and Ready lights:
0
Off
e o n
Step 1
Place the Mode Switch in the
Test postion.
Step2
If
the printer power
is
not on, switch
it on and wait until the automatic test
is
completed (approximately 30
seconds).
Step3
Press the Stop Reset key.
Step4
Press the Start key.
Step5
Observe the status indicator.
(Test
is
completed when
0 appears. To run test
again, press the Start key.)
D
Stop Reset
One Line
D
Start
e
0
Ready
Density Code
A
10CP1al6lp1
15cp1.,t6lp1
10cp•at81pi
15cp1a18lp1
E
HostSyslemControl
[[]
An example of a page of test data is shown on the next page.
Operating Procedures 5-11

Advertisement

Table of Contents
loading

This manual is also suitable for:

5225 25225 35225 4

Table of Contents