Voltage:
Max. Current Draw:
1-Pump System
2-Pump System
Wattage:
1-Pump System:
2-Pump System:
Frequency:
Number of Wires:
Single Breaker is the factory default.
*** For this service, the heater will operate while both jets pumps are running
in high speed. The service 1 breaker will include connections for the
heater and transformer. The service 2 breaker is for all other components.
Note: pump 2 runs only in high speed.
**** In this configuration, the heater will operate while both jets pumps are
running in high speed. The service 1 breaker will include connections for
the heater and transformer. Service 2 breaker is for pump 1 and other
components. Service 3 breaker is for pump 2.
6.0

Electrical Wiring Instructions

IMPORTANT NOTICE: The electrical wiring of this spa
must meet the requirements of the National Electrical Code/
USA (NEC) and/or any applicable state or local codes. The
electrical circuit must be installed by a qualified electrician
and approved by a local building/electrical inspection authority.
1. This spa must be permanently connected (hard-wired) to the power
supply. No plug-in connections or extension cords are to be used
in conjunction with the operation of this spa. Supplying power to
the spa which is not in accordance with these instructions will void
both the independent testing agency listing and the manufacturer's
warranty.
2. The power supplied to this spa must be a dedicated circuit with no
other appliances or lights sharing the power provided by the circuit.
Export Models (50 Hz) Service
Dual Breaker
Service 1/
Service 2***
230 VAC
12A/9A
12A/16A
2.8kW/2.1kW
2.8kW/3.7kW
50 Hz
5
680 Export Series
Three Phase Service
Service 1/
Service 2/Service 3****
230 VAC
N/A
12A/9A/7A
N/A
2.8kW/2.1kW/1.6kW
50 Hz
5