5.11.2 Electrical wiring diagram
Key (Fig. 14)
C
Capacitor
E
Ignition electrodes
F
Flame sensor
F1
Fuse T6A
MV Fan motor
SB
Lock-out signal
TB
Burner-earth
TL
Limit thermostat
TS
Safety thermostat
V
Oil valve
X5
5 pin plug
XP5 5 pole socket
Installation
~ 50Hz - 230V
Main switch
CONTROL BOX
Black
White
Blue
17
TO BE DONE BY
THE INSTALLER
CARRIED OUT
IN THE FACTORY
535SE/LD
20068693
Do not swap neutral and phase over, follow
the diagram shown carefully and carry out a
good earth connection.
The electrical wiring carried out by the
WARNING
installer must be in compliance with the rules
in force in the country.
The section of the conductors must be at least
2
1mm
. (Unless requested otherwise by local
standards and legislation).
WARNING
TESTING:
Check the shut-down of the burner by opening the thermostats
and the lock-out by darkening the flame sensor.
GB
Fig. 14
20130035