5.11.2 Standard Wiring Diagram - Riello 40 GS20 Installation, Use And Maintenance Instructions

Forced draught gas burner
Table of Contents

Advertisement

5.11.2 Standard wiring diagram

20065624
Key (Fig. 17)
AD
Air damper opening motor
B4
Operating signal
C
Motor capacitor
CN1
Ionisation probe connector
E
Ignition electrode
F
Filter
h1
Hour counter (230V - 0.1A max.)
MV
Fan motor
PA
Air pressure switch
PG
Min. gas pressure switch
S3
Lamp block (230V - 0.5A max.)
SO
Ionisation probe
TA
Ignition transformer
TB
Burner earth
TL
Limit thermostat
TS
Safety thermostat
20063800
Installation
RMG88.62C2
T6A
Fuse
V10
Safety valve
V11
Adjustment valve
XP6
6- pole socket
XP7
7-pole socket
X6
6 pin plug
X7
7 pin plug
In the event of phase-phase power supply, a
bridge should be installed on the terminal board of
the control box between clamp 6 and the earth
WARNING
clamp.
20
GB
Fig. 17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents