Maintenance; Maintenance Schedule - Atlas Copco QAS 14 Kd S5 ESF Instruction Manual

Table of Contents

Advertisement

5

Maintenance

5.1

Maintenance schedule

!
Before carrying out any maintenance activity, check that the start switch is in position O and that no electrical power is present on the terminals.
Maintenance schedule
Service pack
For the most important subassemblies, Atlas Copco has developed service kits that combine all wear parts. These service kits offer you the benefits of genuine parts,
save on administration costs and are offered at reduced price, compared to the loose components. Refer to the parts list for more information on the contents of the
service kits.
Drain water from fuel filter
Check/Fill fuel level (3)
Empty air filter vacuator valves
Check air intake vacuum indicators
Check engine oil level (if necessary top up)
Check coolant level
Check control panel for alarms and warnings
Check on abnormal noise
Check function of coolant heater (option)
Replace air filter element (1)
Check/Replace safety cartridge
Change engine oil (2) (6)
Replace engine oil filter (2)
Replace fuel (primary) filter(s) (5)
Replace fuel (secondary) filter(s) (5)
50 hrs
Every 250
Daily
after initial
start-up
-
-
x
x
x
x
x
x
x
x
x
x
- 45 -
Every 500
Every 1000
hours
hours
-
-
x
x
x
x
x
x
Every 2000
hours
hours
-
-
x
x
x
x
x
Yearly
-
x
x
x
x
x
x
x

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qas 20 kd s5 esfD1705m-e4bgV2203m-e4bg

Table of Contents