Every 100 Hours Service - Komatsu D32E-1 Operation & Maintenance Manual

Bulldozer
Hide thumbs Also See for D32E-1:
Table of Contents

Advertisement

24. SERVICE PROCEDURE
24.4.2 LUBRICATION
24.4.2.1
RIPPER LINKAGE (12 POINTS)
1. Lower all mounted equipment to the ground.
2. Apply grease until clean lubricant
is visible. Always
use a clean
lubricator and wipe dirt from fittings before fresh grease is applied. If
grease fails to go through the fitting, determine the cause and correct
it. After greasing, wipe off any old grease that was purged.
24.4.2.2
BLADE ANGLE FRAME TO C FRAME PIN (2 POINTS)
1. Lower all mounted equipment to the ground.
2. Apply grease until clean lubricant
is visible. Always
use a clean
lubricator and wipe dirt from fittings before fresh grease is applied. If
grease fails to go through the fitting, determine the cause and correct
it. After greasing, wipe off any old grease that was purged.
24.5 EVERY 100 HOURS SERVICE
24.5.1
BLADE CUTTING EDGE HARDWARE
Check the torque of the blade cutting edge hardware.
U
Plow bolt nuts:
455 N*m (335 Ibf ft)
3-36

Advertisement

Table of Contents
loading

Table of Contents