Installation; Notes On Safety For The Installation; Handling; Preliminary Checks - Riello RS 45/E LN Installation, Use And Maintenance Instructions

Forced draught gas burner
Table of Contents

Advertisement

4

Installation

4.1

Notes on safety for the installation

After carefully cleaning all around the area where the burner will be
installed, and arranging the correct lighting of the environment, pro-
ceed with the installation operations.
All the installation, maintenance and disassembly
operations must be carried out with the electricity
supply disconnected.
DANGER
4.2

Handling

The packaging of the burner includes a wooden platform, so it is
possible to move the burner (still packaged) with a transpallet truck
or fork lift truck.
The handling operations for the burner can be high-
ly dangerous if not carried out with the greatest at-
tention: keep any unauthorised people at a
distance; check the integrity and suitableness of the
WARNING
available means of handling.
Check also that the area in which you are working
is empty and that there is an adequate escape area
(i.e. a free, safe area to which you can quickly move
if the burner should fall).
During the handling, keep the load at not more than
20-25 cm from the ground.
4.3

Preliminary checks

Checking the consignment
After removing all the packaging, check the integrity
of the contents. In the event of doubt, do not use the
burner; contact the supplier.
CAUTION
The packaging elements (wooden cage or card-
board box, nails, clips, plastic bags, etc.) must not
be abandoned as they are potential sources of dan-
ger and pollution; they should be collected and dis-
posed of in the appropriate places.
4.4

Preparing the boiler

4.4.1

Boring the boiler plate

Drill the combustion chamber mounting plate as shown in Fig. 10.
The position of the threaded holes can be marked using the head
gasket supplied with the burner.
inch
A
9
RS 45/E LN
6
/
32"
Installation
B
C
13
3
8
/
/
W
16"
8
Tab. H
15
The installation of the burner must be carried out by
qualified personnel, as indicated in this manual and
in compliance with the standards and regulations of
the laws in force.
WARNING
After positioning the burner near the installation
point, correctly dispose of all residual packaging,
separating the various types of material.
CAUTION
Before proceeding with the installation operations,
carefully clean all around the area where the burner
will be installed.
The output of the burner must be within the boil-
er's firing rate.
WARNING
A burner label that has been tampered with, re-
moved or is missing, along with anything else that
prevents the definite identification of the burner
makes any installation or maintenance work diffi-
WARNING
cult.
GB
D455
Fig. 10
20026767

Advertisement

Table of Contents
loading

This manual is also suitable for:

C9341400

Table of Contents