Riello RS 45/E LN Installation, Use And Maintenance Instructions page 15

Forced draught gas burner
Table of Contents

Advertisement

Operation sequence of the burner
Phase number
Safety limit thermostat (STB)
Control thermostat or pressurestat (R)
Flame signal (FS)
Air pressure switch (LP)
Pressure switch-min (Pmin)
Pressure switch-max (Pmax)
Valve proving / leakage test (P LT)
POC (alternative to Pmax)
Motor (M)
Ignition transformer (Z)
Safety valve (SV)
Fuel valve 1 (V1)
Fuel valve 2 (V2)
Pilot valve (PV)
Alarm (AL)
Nominal load
Postpurge position
Ignition load
No-load position
Nominal load
Postpurge position
Ignition load
No-load position
Nominal load
Postpurge position
Ignition load
No-load position
D9288
Legend to the sequence diagrams:
Valve proving takes place depending on the parameter:
2)
Only with valve proving on startup
3)
Parameter: with/without alarm in the event of start prevention
4)
In the event of an erroneous signal on startup, followed by
phase 10, otherwise phase 70
Position as supplied (0°)
90° Actuator fully open (90°)
Assignment of times:
t1
Prepurge time
TSA1 Safety time 1 gas / oil
TSA2 Safety time 2 gas / oil
Technical description of the burner
00
02
10
12
22
24
T
T
p
a
P
P
P
3)
90°
Low-fire
90°
Low-fire
90°
Low-fire
Operation
Startup
TSA2
t1
TSA1
30
36
38
40
42
44
50
52
60
Signal ON
Signal OFF
Any signal is allowed
In standby: after referencing, the actuator is driven to the
no-load position
13
GB
Shutdown
80
62
70
72
74
4)
Valve proving
81
82
83
90
2)
Fig. 8
20026767

Advertisement

Table of Contents
loading

This manual is also suitable for:

C9341400

Table of Contents