Figure 40: How to Install Heat-Shrink Tubing
6.
Remove the nuts from the four terminals. See
Figure 41: Removing the Nuts from the Terminals
7.
Secure each power cable lug to the terminal with the nuts. Tighten the nuts on the power supply
terminals until snug by using the screwdriver. Do not apply vertical force while tightening the
screws. Do not overtighten the nuts. (Use a socket nutdriver.)
Figure 41 on page
85.
85