Energy zeroCO2 XL Operation Manual page 39

Large storage inverter system
Table of Contents

Advertisement

16. Open the front and rear doors of the rack (Fig. 4.22 and Fig. 4.23).
17. Remove the kit carried inside it .
18. Place the D+, D- and RJ45 cables coming from the PCS inside the rack, passing
them through the appropriate slots at the sockets and the back of the base (Fig.
4.24).
19. Only after passing the D+, D- and RJ45 cables coming from PCS, place the rack at
a minimum distance of 5 cm from the wall and 2 cm from any other objects to the
side. When positioning the fi nished positioning, be careful not to damage the DC,
AC and communication cables placed (Fig. 4.25).
Fig. 4.22
40 - Reception and handling
Fig. 4.23

Advertisement

Table of Contents
loading

Table of Contents