5. Return the jam recovery map and close the front upper cover.

Checking after Installation

■ Disposal Parts
1. Following disposal parts are remained after completion of the installation work.
[1] 2x Face Cover of the host machine
[2] 1x Screw (Binding; M4x10)
[3] 1x Interface Cable
[4] 1x Screw (W Sems; M4x12)
[5] 2x Screw (RS Tightening; M4x8)
[6] 1x Stopper (front)
[7] 1x Stopper (rear)
[8] 2x Screw (Flat Head Screw; M3x5)
[9] 1x Removed Face Cover
■ Operation Checks
1. When all the installations have completed, check that the Leakage Breaker is turned ON.
2. Turn ON the main power of the host machine.
Leakage Breaker
603
6. Paper Output Options