Step 12: Roof Framing
You will need for this page:
(QTY: 12)
1
Seal the gap between the Gables using the weather stripping tape as shown. Do
this at both ends of the building before installing Roof Beams.
2
Position the Roof Beams as shown below and install using two (2) bolts and nuts
per side. Install the Main (center) Beam fi rst.
Tape should wrap around gap between Gables.
Beam End Views
Angled side of Beams must face up.
2
Assemblies from Step 3:
8474
Main Roof Beam Assembly (1)
Roof Beam
Tape BOTH Gable joints before installing Roof Beams.
28
Top View of Gables
Weather Stripping Tape
CUT
28AX

Advertisement