BUILDING DIMENSIONS
Approx.
Size
10' x 6'
54 Sq. Ft. 325 Cu. Ft.
3,0 m x 1,7 m
5,0 m
* See Inside for Detailed Safety Information.
or
Size rounded off to the nearest foot
Exterior Dimensions
Storage
(Roof Edge to Roof Edge)
Area
Width
123 1/4"
2
9,2 m 3
313,1 cm
Depth
Height
Width
71 1/4"
77 7/8"
118 1/4"
181,0 cm
197,8 cm
300,4 cm
www.arrowsheds.com
Model No.
10' x 6'
Base
121" x 68 3/4"
Size
307,3 cm x 174,6 cm
For proper base construction see page 12
Interior Dimensions
(Wall to Wall)
Depth
Height
66"
76 5/8"
167,6 cm
194,6 cm
01AXa
LM10667S
Nominal Size
Door
Opening
Width
Height
55 1/2"
65"
141,0 cm
165,1 cm

Advertisement

Table of Contents
loading

Summary of Contents for Arrow Storage Products LM10667S

  • Page 1 01AXa 721120719 Owner’s Manual & Assembly Guide www.arrowsheds.com Gloves must be worn Model No. LM10667S at all times to reduce risk of injury! 10’ x 6’ Nominal Size Customer Service: 1-800-851-1085 Base 121” x 68 3/4” assist@arrowsheds.com Size 307,3 cm x 174,6 cm BUILDING DIMENSIONS †...
  • Page 2 SAFETY PRECAUTIONS... Safety precautions MUST be followed at all times throughout the construction of your building! Practice caution with the tools being used in the Care must be taken when handling various pieces assembly of this building. Be especially familiar with of your building since many contain sharp edges.
  • Page 3: What You Need

    ASSEMBLY TIPS & TOOLS Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm. Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Use Teamwork: Two or more people are required to assemble your building.
  • Page 4: Frequently Asked Questions

    FREQUENTLY ASKED QUESTIONS How long will it take to assemble the building? Assembly time depends on a variety of factors, including roof design, tools available, DIY skill and the pace at which you work. Guidelines for each shed assembly are approximate AFTER completion of the base, and assume two or more people working on the assembly.
  • Page 5 What kind of base do I use? You can: •Use an Arrow Base Kit •Pour a concrete slab •Build a wood deck/fl oor (use exterior-grade plywood) •Use patio blocks •Build on crushed gravel, dirt or grass Arrow provides a base kit accessory that is an option for most building sizes. If you are building a wood deck/fl oor, an Arrow fl...
  • Page 6: Customer Service

    What if the rear wall angle and channels are too large to fi t inside of the rear wall panels? Check the dimensions of wall assemblies. They should be slightly smaller than the fl oor frames. Lay the assemblies on top of the rear fl oor frame and pull them up to the top of the wall panels causing the corner panels to stand erect and not lean inward.
  • Page 7 HARDWARE LIST... 07AXa Hardware Views by Key No. Part Part Qty. Description #2 Phillips #2 Phillips List 11/32 Hex. 65103 Hex Nut (#8-32) 65923 Small Bolt (#8-32 x 3/8) (10 mm) 65004 Small Screw (#8AB x 5/16) (8 mm) 65900A Black Tapping Screw (#10B x 1/2) (13 mm) #2 Phillips 66045...
  • Page 8 PARTS LIST... 08AX Selected End Views by Key No. Part No. Part Description Qty. List 3719 Door Handle Brace 6635 Gable Brace 9365 Front Wall Channel 10497 Horizontal Door Brace 5986 Rear Wall Angle 6000 Right Gable 6001 Left Gable 6300 Vertical Door Brace 6403...
  • Page 9 ASSEMBLY BY KEY NO. 09AX Walls Floor...
  • Page 10 ASSEMBLY BY KEY NO. 10AX Roof Doors...
  • Page 11: Assembly Overview

    ASSEMBLY OVERVIEW 11AX Install Corners, Wall Angles, and Door Build the Floor Frame Track Attach Gables and Roof Beams Install Wall Panels, Wall Channels, and Door Jambs Install Roof Panels, Ridge Cap, Side Install Doors Trim, and Corner Cap Shed is now complete.
  • Page 12 CONSTRUCTING A BASE... 12AX No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an effective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.).
  • Page 13 Step 1: Floor Frames 13AX You will need for this page: 8936 Rear Floor (QTY: 5) Frame Assemble the Rear Floor Frames. Bolts thru Top. Bolts thru Bottom. 8936 Overlap two (2) Rear Floor Frames as shown and secure with fi ve (5) bolts. Two (2) bolts must enter from bottom.
  • Page 14 Step 1: Continued 14AX You will need for this page: 9367 8934 119 3/8” 303,2 cm Finished Length Front Floor Ramp (QTY: 8) Frame 9367 Overlap the Ramp and two (2) Front Floor 8934 Frames so that four (4) holes align at each end as shown.
  • Page 15 Step 2: Wall Frames You will need for this page: 5986 9917 Rear Angle Rear Channel (QTY: 2) 5986 9917 5986 Overlap two (2) Rear Wall Channels so that three (3) holes align as shown. Insert 9917 a bolt and nut through the center hole. Check that the fi...
  • Page 16 Step 3: Roof Beams 16AX You will need for this page: 8474 8476 Side Angle Roof Beam (QTY: 10) Place a Side Wall Angle, back-to-back, with a Roof Beam and fasten together using ten (10) screws. Set aside for use in Step 12. 8476 8474...
  • Page 17: Step 4: Door Track

    Step 4: Door Track You will need for this page: 6403 9366 Long Leg on top. (QTY: 4) Track Splice Door Track Door Slide Insert screws into bottom side only. The Gables will fasten to the Door Track using the holes on the top side. Position Slides as shown.
  • Page 18: Step 5: Frame Assembly

    Step 5: Frame Assembly You will need for this page: Assemblies from Step 1: • Front Floor Assembly (1) • Side Floor Assembly (2) • Rear Floor Assembly (1) (QTY: 8) (QTY: 2) Do NOT fasten your Floor Frames to your Base at this time. You will anchor your building after it is erected.
  • Page 19 Step 6: Corners 19AX You will need for this page: 6627 9374 8471 (QTY: 26) (QTY: 4) Corner Panel Wall Panel Front Panel 6627 6627 Place washers on all bolts and screws used on painted parts. Use one person to support the Corner while 8471 8471 another secures the Panels.
  • Page 20 Step 7: Wall Framing 20AX You will need for this page: Assemblies from Step 2 and Step 4: 8476 • Rear Wall Angle Assembly (1) • Door Track Assembly (1) Side Angle (QTY: 18) Wall Angles must face inside the building. Door Slides should be in Door Track at this time.
  • Page 21 Step 8: Wall Panels 21AX FASTEN TO WALL ANGLES You will need for this page: 6627 [ NO HARDWARE NEEDED FOR THIS STEP ] Wall Panel Lay out all Panels in the positions shown below. FASTEN TO WALL CHANNELS (STEP 10) Use the diagram to the right when attaching Wall Panels.
  • Page 22 Step 8: Continued 22AXa You will need for this page: Working one side at a time, lift the Panels into (QTY: 64) (QTY: 11) place and secure top and bottom of Panels with screws. Be sure to overlap ribs as shown on the previous page.
  • Page 23 Step 9: Door Jambs 26AW You will need for this page: 9370 Door Jamb (QTY: 8) (QTY: 4) Secure Door Jambs with two (2) screws in the top and bottom of each Panel as shown. Insert two (2) bolts and nuts into the back side of each Panel as shown below.
  • Page 24 Step 10: Wall Channels 24AXa You will need for this page: Assemblies from Step 2: 9365 • Rear Wall Channel Assembly (1) • Side Wall Channel Assemblies (2) Front Channel (QTY: 48) Install Rear Wall Channel by placing screws through all remaining holes in Wall Panels. Install Side Wall Channels by placing screws through all remaining holes in Wall Panels.
  • Page 25 Step 11: Gables 28AW You will need for this page: 6001 6000 5971 (QTY: 8) Left Gable Right Gable Bracket GABLES ARE STACKED TOGETHER DURING SHIPPING AND MAY BE MIS- TAKEN FOR ONE GABLE! SEPARATE GABLES BEFORE CONTINUING. Edge Trim (Plastic) Edge Trim MUST cover Gable edge.
  • Page 26 Step 11: Continued 26AX You will need for this page: 6635 (QTY: 8) (QTY: 3) Gable Brace Gable must fi t UNDER Side Wall Angle at corner. Working with one Gable at a time, attach the Rear Gables to the Rear Use bolts where Angles overlap.
  • Page 27 Step 11: Continued 27AXa You will need for this page: 6635 (QTY: 12) (QTY: 2) Gable Brace Track Sup. Leave two (2) holes open on each side of the Gable peak to attach Track Support. Working with one Gable at a time, attach the front Gables to the Door Track with screws.
  • Page 28 Step 12: Roof Framing 28AX You will need for this page: Assemblies from Step 3: 8474 • Main Roof Beam Assembly (1) (QTY: 12) Roof Beam Seal the gap between the Gables using the weather stripping tape as shown. Do this at both ends of the building before installing Roof Beams.
  • Page 29 Roof Install Prep Page 29AX Use the information on this page to complete steps 13 thru 14. If Roof Beam holes do not line up with Roof Panel holes, shift the building from left to right. If this does not help, your building may not be level. Shim the corners until holes line up.
  • Page 30: Step 13: Roof Assembly

    Step 13: Roof Assembly 33AW You will need for this page: 10408 10409 Roof Skylight (QTY: 6) Panel Panel Place Skylight Panel and Roof Panel according to the diagram below. Ensure that the ends of the Panels with the slotted holes are at the same end with the slot to the outside of the fi...
  • Page 31 Step 13: Continued 31AX You will need for this page: 8469 8468 67545 Right Roof Weather Left Roof (QTY: 10) (QTY: 4) Stripping Panel Panel Attach Back Right Roof Panel to Top Roof Beam only using a screw. Remove Edge Trim from the Left Gable under the Roof Panel.
  • Page 32 Step 13: Continued 32AX You will need for this page: 6529 • Skylight Assemblies (2) Roof Panel (QTY: 32) (QTY: 4) FASTEN TO RIDGE CAP (NEXT PAGE) Continue to apply weather stripping. Attach two (2) Roof Panels and two (2) Skylight Assemblies using the diagram to the left while assembling the roof.
  • Page 33 Step 13: Continued 33AXa You will need for this page: 8469 8468 8461 Right Roof Left Roof (QTY: 24) (QTY: 16) Ridge Cap Panel Panel Continue to apply weather stripping. Attach Front Left and Right Roof Panels, one at a time, to Roof Beams using eight (8) screws per Panel.
  • Page 34 Step 14: Roof Trim 34AX You will need for this page: 8482 (QTY: 4) (QTY: 6) (QTY: 4) Roof Trim Trim Cap (L) Trim Cap (R) Peak Cap Slide Peak Cap legs under Ridge Cap and secure with two (2) bolts and nuts on each end.
  • Page 35: Step 15: Door Assembly

    Step 15: Door Assembly 39AW You will need for this page: 10477 3719 6300 Door Handle Brace Vert. Brace (QTY: 3) (QTY: 2) Handle Do not fully tighten the bolts that hold on the Door Handle until the Vertical Door Brace is in place. Attach the Door Handle and Door Handle Brace to the Door with two (2) bolts and nuts as shown.
  • Page 36 Step 15: Continued 40AW You will need for this page: 10497 Horiz. Brace (QTY: 6) Door Guide Slide Horizontal Brace over Door edge and secure with one (1) bolt and nut in top and bottom. Secure the Door Guides and Lower Horizontal Door Brace as shown below.
  • Page 37: Door Adjustment

    Step 16: Door Install 41AW You will need for this page: Assemblies from Step 16: • Right Door Assembly (1) • Left Door Assembly (1) (QTY: 8) Gable From inside the building, place the bottom Door Slide of the Door into the Front Floor Frame track at about the half-open position.
  • Page 38 ANCHORING OPTIONS... IMPORTANT: • If you have swing doors, they must hang and swing level before anchoring building. • Anchor your building at this time. See below for details on anchoring. • If you have purchased a Floor Frame Kit, you should install it at this time. •...
  • Page 39 CARE & MAINTENANCE... Exterior Care: For a long lasting fi nish, clean and wax the exterior surface. We recommend washing with a mild soap solution. DO NOT use power washing to clean your shed. Using a spray automotive type wax periodically on the exterior is highly recommended if you are in a high humidity or coastal climate region.
  • Page 40: How To Order

    ARROW ACCESSORIES... ROOF STRENGTHENING FLOOR FRAME KITS (heavy snow load) KITS Extra roof beams and gable braces MODELS FB47410, FB5465, designed for added protection against FB106-A, FB109-A and FB1014-A heavy snow accumulation. Increases the strength of your roof. A simple fl oor frame system made of heavy-duty, hot-dipped BEFORE AFTER galvanized steel.