Manufactured Mobile Home Additional Requirements; Installation Checklist; Locating Your Fireplace; Duct System Option - Regency Panorama P33E-NG11 Manual

Table of Contents

Advertisement

Manufactured Mobile Home
Additional Requirements
1. Ensure that structural members are not cut or
weakened during installation.
2. Ensure proper grounding using the #8 ground
lug provided. Refer to "Wiring Diagram" Section.
Installation
Checklist
1) Locate appliance
a) Room location
(Refer to "Locating Your Fireplace" Section)
b) Clearances to Combustibles
(Refer to "Clearances" Section)
c) Mantle Clearances
(Refer to "Combustible Mantels" Section)
d) Framing & Finishing Requirements (Refer
to "Framing & Finishing" Section)
e) Venting Requirements
(Refer to "Venting" Sections)
2) Assemble Top Facing Support and Side
Nailing Strips (Refer to "Unit Assembly Prior
to Installation" Section). NOTE: Must be done
before installing unit into fireplace.
3) Install vent (Refer to "Venting" Sections)
4) Wire 120 volt AC power to the supplied
receptacle box located on lower left hand
side of appliance. The Duplex receptacle
and receptacle cover are also included and
will be located in the manual package. Note
: This heater does not require 120 volt AC
supply for operation of the burner but is highly
recommended as a primary power source to
eliminate the need for 4 AA batteries. Batteries
should only be used as a secondary power
source when power is lost within the home. 120
Volt AC power is also required for the optional
blower.
5) Install junction box supplied with appliance.
Install remote receiver inside of junction box.
Hook receiver to wire marked receiver. This will
enable operation of the burner. If 120 Volt AC
power was brought to appliance, batteries are
not required.
6) Make gas connection.
7) Test the pilot. Must be as per diagram.
(Refer to "Gas Line Installation" and "Pilot
Adjustment" Section).
8) Convert to Propane if desired.
(Refer to "Conversion Kit from NG to LP"
Section).
9) Install standard and optional features. Refer to
the following sections:
a. Plug AC adaptor into 120 volt receptacle
b. Code Remote supplied with unit
c. Optional Brick Panels/Enamel Panels
d. Log Set Installation
e. Standard Flush Door
f. Vignette Facepplate/Vignette Finishing
Trim
g. Louvers and Safety Screen
h. Optional Wall Thermostat
i. Optional Fan Installation
10) Final check.
Before leaving this unit with the customer, the
installer must ensure that the appliance is firing
correctly and operation fully explained to
customer.
This includes:
1) Clocking the appliance to ensure the correct
firing rate (rate noted on label) after burning
appliance for 15 minutes.
2) If required, adjusting the primary air to ensure
that the flame does not carbon. First allow the
unit to burn for 15-20 min. to stabilize.
CAUTION: Any alteration to the product that
causes sooting or carboning that results
in damage is not the responsibility of the
manufacturer.

Locating your Fireplace

1) When selecting a location for your fireplace,
ensure that the clearances outlined on this page
are met.
2) Provide adequate clearances for servicing.
3) The appliance must be installed on a flat, solid,
continuous surface (e.g. wood, metal, concrete).
This may be the floor, or raised up on a platform
to enhance its visual impact. If the appliance is
going to be installed on carpeting, combustible
linoleum tile or other combustible material other
than wood flooring, the appliance must be
installed on a metal or wood panel extending
the full width and depth of the appliance.
4) The P33E-11 can be installed in a recessed
position or framed out into the room as in A, B,
C, D. See Diagram 1 below.
5) This appliance is Listed for bedroom installations
when used with a Listed Millivolt Thermostat.
Some areas may have further requirements,
check local codes before installation.
6) The P33E-11 Direct Vent Gas Fireplace is
approved for alcove installations, which meet the
clearances listed on the "Clearances" Section.
7) We recommend that you plan your installation on
paper using exact measurements for clearances
and floor protection before actually installing this
appliance. Have a qualified inspector, dealer, or
installer review your plans before installation.
Note: For vent terminations see "Exterior Vent
Termination Locations" Section.
A)
B)
C)
D)

Duct System Option

Kit #946-556
The HeatWave Air Duct Kit increases the
effectiveness of your fireplace by dispersing warm
air from the fireplace to remote locations in the same
room or other rooms in your home.
Up to two kits may be installed on the fireplace.
Please Note: Only 1 HeatWave kit may be oper-
ated at one time. This includes the internal blower
option as well.
Regency
P33E-11 Zero Clearance Direct Vent Gas Fireplace
®
installation
Flat on Wall
Flat on Wall Corner
Recessed into Wall/Alcove
Corner
Diagram 1
|
17
|