Installing Gas Supply - Hobart H100S2-10 Owner's Manual

Hide thumbs Also See for H100S2-10:
Table of Contents

Advertisement

5-6. Installing Gas Supply

.
DO NOT use Argon/Mixed gas regulator/flowmeter with CO
shielding gas. See Accessories/Consumable for optional CO
gas regulator/flowmeter.
7
6
Feedhead Pressure Assembly Open
Feedhead Pressure Assembly Closed
2
2
4
5
Tools Needed:
.
A complete Parts List is available at www.HobartWelders.com
1
2
3
Argon Gas Or
Mixed Gas
5/8 or 11/16, 1-1/8 in.
Obtain gas cylinder and chain to
running gear,
wall,
or
other
stationary support so cylinder
cannot fall and break off valve.
1
Cap
2
Cylinder Valve
Remove cap, stand to side of valve,
and open valve slightly. Gas flow
blows dust and dirt from valve.
Close valve.
3
Cylinder
4
Regulator/Flowmeter
Install so face is vertical.
5
Regulator/Flowmeter Gas
Hose Connection
6
Welding Power Source Gas
Hose Connection
Connect
supplied
gas
hose
between regulator/flowmeter gas
hose connection, and fitting on rear
of welding power source.
7
Flow Adjust
Flow rate should be set when gas is
flowing through welding power
source and welding gun. Open
feedhead pressure assembly so
that wire will not feed. Press gun
trigger to start gas flow.
Typical flow rate is 20 cfh (cubic
feet
per
hour).
Check
wire
manufacturer's
recommended
flow rate.
After flow is set, close pressure
assembly.
258 331-B
OM-258 267 Page 15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Handler 140

Table of Contents