Installing Gas Supply; Installing Wire Spool And Adjusting Hub Tension - Hobart BETA-MIG 2250 Owner's Manual

Gas metal arc (mig) welding, flux cored arc (fcaw) welding, arc welding power source and wire feeder
Table of Contents

Advertisement

2-7. Installing Gas Supply

2-8. Installing Wire Spool And Adjusting Hub Tension

OM-192 440 Page 12
1
OR
2
3
4
When a slight force is needed to turn spool, tension is set.
1
Argon Gas
5
CO
Gas
2
Use compression spring with
8 in (200 mm) spools.
Chain gas cylinder to running gear,
wall, or other stationary support so
cylinder cannot fall and break off
valve.
1
Regulator/Flow Gauge
Install so face is vertical.
2
Gas Hose Connection
Fitting has 5/8-18 right-hand
threads.
3
Flow Adjust
Typical flow rate is 20 cfh (cubic
feet per hour). Check wire man-
ufacturer's recommended flow
rate (see Section 3-2). This flow
gauge can be adjusted between 5
and 25 cfh.
4
CO
Adapter
2
Customer Supplied
5
O-Ring
Install adapter with O-ring between
regulator/flow gauge and CO
cylinder.
Tools Needed:
1-1/8, 5/8 in
Ref. ST-801 789 / Ref. ST-149 827-B / Ref. ST-158 697-A
Tools Needed:
2
15/16 in
ST-072573-B

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents