12 SERVICE WORK ON THE CHASSIS
12.8
66
V01784-10
Installing the fork legs
402556-10
V01756-11
V01784-11
K00546-10
(All Six Days models)
–
3
Loosen screws
. Take out the left fork leg.
–
4
Loosen screws
. Take out the right fork leg.
Main work
–
Position the fork legs.
1
Bleeder screws
are positioned toward the front.
Info
Grooves are milled into the side of the upper end of the
fork legs. The second milled groove (from the top) must
be flush with the upper edge of the upper triple clamp.
(EXC‑F EU, XCF‑W, EXC‑F BR)
–
2
Tighten screws
.
Guideline
Screw, top triple
clamp
–
3
Tighten screws
.
Guideline
Screw, bottom
triple clamp
(All Six Days models)
–
2
Tighten screws
.
Guideline
Screw, top triple
clamp
–
3
Tighten screws
.
Guideline
Screw, bottom
triple clamp
–
Position the brake caliper, and mount and tighten screws
Guideline
Screw, front
M8
brake caliper
–
Mount the cable ties.
–
Position the brake line, the wiring harness, and the clamp.
Mount and tighten screws
M8
20 Nm
(14.8 lbf ft)
M8
15 Nm
(11.1 lbf ft)
M8
17 Nm
(12.5 lbf ft)
M8
15 Nm
(11.1 lbf ft)
25 Nm (18.4 lbf ft)
Loctite
®
5
.
4
.
243™