Mounting Requirements - Omron SYSMAC C200H CPU01-E Installation Manual

Table of Contents

Advertisement

Mounting Requirements

5-2
Mounting Requirements
DIN Rail Mounting
7.3-mm Height
16-mm Height
Downloaded from
Elcodis.com
electronic components distributor
All manuals and user guides at all-guides.com
The PC consists of from one to three Racks. Each Rack must be mounted verti-
cally, that is with the printing on the front panels oriented as it would normally be
read. The Racks should be mounted one above the other with the CPU Rack
uppermost as shown below.
These connectors
are not used.
Cover them with
caps.
The C200H is approved by Underwriters Laboratories under the condition that,
"The device must be mounted vertically for ventilation purposes".
The PC may be mounted using DIN Rail if desired. This type of mounting is not
required, and the PC may be directly mounted to any sturdy support meeting the
environmental specifications (refer to Appendix B Specifications ). If you want to
mount the PC on DIN Rail, you can order a DIN Rail from OMRON (refer to Ap-
pendix B Standard Models ). DIN Rails come in the two heights shown below.
Section
CPU Rack
Expansion Rack
Expansion Rack
5-2
47

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sysmac c200h cpu03-eSysmac c200h cpu11-e

Table of Contents