Functional Elements: Pure Boiler; Ce Label; Set-Up 4; Transporting The Unit - Vaillant ecoFIT sustain 615 Installation And Maintenance Instructions Manual

Hide thumbs Also See for ecoFIT sustain 615:
Table of Contents

Advertisement

Information on the
Meaning
data plate
Read the instructions.
GC no.
Gas council number
3.3

Functional elements: Pure boiler

10
11
9
8
7
6
5
4
3
2
1
1
Electronics box
2
Heating circuit expan-
sion relief valve
3
Condensate siphon
4
Flue pipe
5
Pressure sensor
6
Flue gas analysis point
(for the rear air/flue
connection)
7
Ignition transformer
8
Gas valve assembly
9
Air intake pipe
0020277252_00 ecoFIT sustain Installation and maintenance instructions
12
13
14
15
17
16
10
Fan/gas-air mixture
11
Supply air test point
(for the upper air/flue
connection)
12
Flue gas analysis point
(for the upper air/flue
connection)
13
Primary heat exchanger
14
Heating expansion
vessel
15
Purging hose
16
Heating pump
17
Bypass
3.4

CE label

The CE label shows that the products comply with the basic
requirements of the applicable directives as stated on the
identification plate.
The declaration of conformity can be viewed at the manufac-
turer's site.
4
Set-up
4.1

Transporting the unit

Important: With regard to the regulations of 1992 concern-
ing the manual handling of loads, the unit exceeds the
weight that can be lifted by a single person.
4.1.1
General
Hold the load as close as possible to your body. Avoid
rotational movements. Instead, reposition your feet.
If the unit is being lifted by two persons, ensure your
movements are coordinated during lifting.
Avoid bending your upper body – do not lean forwards or
to the side.
Wear suitable non-slip protective gloves in order to pro-
tect your hands against sharp edges. Ensure that you are
carrying the load securely.
If required, get somebody to assist you in this.
4.1.2
Unloading the box from the delivery van
It is recommended that two people lift the unit together.
Lift the box using the straps provided.
Use safe lifting techniques – keep your back straight and
bend your legs at the knee.
Hold the load as close as possible to your body.
If the unit is being lifted by two persons, ensure your
movements are coordinated during lifting.
If required, get somebody to assist you in this.
4.2

Unpacking the product

1.
Remove the product from its box.
2.
Remove the protective film from all of the product's
components.
4.3

Checking the scope of delivery

Check that the scope of delivery is complete and intact.
Quantity
Description
1
Heat generator
1
Hanging bracket
Flexible condensate drain pipework
1
4
3/4" seals
3
1/2" seals
2
Service valve
1
Gas isolator cock
2
Connection pipe (heating flow and return)

Set-up 4

7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents