7 Start-up
Do not use any unsuitable frost and cor-
rosion protection agents, biocides or seal-
ants.
No incompatibility with our products has been detected to
date with proper use of the following additives.
When using additives, follow the manufacturer's instruc-
tions without exception.
We accept no liability for the compatibility of any additive or
its effectiveness in the rest of the heating system.
Additives for cleaning measures (subsequent
flushing required)
Adey MC3+
Adey MC5
Fernox F3
Sentinel X 300
Sentinel X 400
Additives intended to remain permanently in the
installation
Adey MC1+
Fernox F1
Fernox F2
Sentinel X 100
Sentinel X 200
Additives for frost protection intended to remain
permanently in the installation
Adey MC ZERO
Fernox Antifreeze Alphi 11
Sentinel X 500
If you have used the above-mentioned additives, inform
the end user about the measures that are required.
Inform the end user about the measures required for frost
protection.
7.5
Avoiding danger arising from insufficient
water pressure
The filling pressure must be between 0.10 and 0.15 MPa
(1.0 and 1.5 bar).
If the heating installation extends over several storeys,
higher filling pressures may be required to avoid air entering
the heating installation.
If the water pressure falls below 0.05 MPa (0.5 bar), the
value flashes in the display.
If the water pressure falls below 0.03 MPa (0.3 bar), the
product switches off. The display shows 0.0 MPa (0.0 bar).
Fault F.22 is stored in the fault list.
Top up the water in the heating installation to start up the
product again.
The pressure value flashes in the display until a
pressure of 0.05 MPa (0.5 bar) or higher has been
reached.
16
7.6

Switching on the product

Switch on the product via the main switch installed on-
site.
7.7

Filling and purging the heating installation

Preliminary work
Flush the heating installation through.
1
1.
Check the silicone hose connection (1) between the
pump's automatic air vent and the hydraulic console.
2.
Fill with water until the required filling pressure is
reached.
Recommended filling pressure: 1 ... 1.5 bar
The heating and hot water functions cannot be activ-
ated.
The pressure value flashes in the display until a
pressure of 0.05 MPa (0.5 bar) or higher has been
reached.
An automatic air vent function is activated if the
pressure exceeds 0.05 MPa (0.5 bar) for longer than
15 seconds.
3.
Purge each radiator until the water escapes normally,
and then retighten the system's purging valves.
4.
Check that all connections are leak-tight.
Conditions: If the noise persists in the boiler
Purge the product again by activating check programme
P.00.
Installation and maintenance instructions ecoFIT sustain 0020277252_00