Powering On Procedures For Powerstore Node; Power On A Powerstore T Model Node Using A Service Script; Power On A Powerstore T Model Node By Reseating The Node - Dell PowerStore 1000 Installation And Service Manual

Table of Contents

Advertisement

6. Monitor the vCenter server console and confirm that the ESXi host for the PowerStore X model node has entered
Maintenance Mode.
7. Using vCenter commands, shut down the ESXi host that is in Maintenance Mode.
8. Monitor the vCenter server console to ensure that the ESXi host has shut down.
Next steps
To verify that the node has powered off, check the status of the LEDs in the rear of chassis. Other than the LEDs for the power
supply unit, management port, and service port, all other LEDs on the node must be OFF. The Unsafe to Remove LED on the
active or peer node appears ON.

Powering on procedures for PowerStore node

This section includes the following procedures:

Power on a PowerStore T model node using a service script

Power on a PowerStore T model node by reseating the node

Power on a PowerStore X model node using a service script
Power on a PowerStore X model node by reseating the node
Power on a PowerStore T model node using a service script
Prerequisites
Obtain the following information:
● Management IP address of the appliance that contains the node. In PowerStore Manager, go to Settings > Networking >
Network IPs > Management. Review the Management IPs table to identify the management IP address associated with
the appliance.
● Service account credentials
About this task
Use the following procedure to power on (power up) a PowerStore T model node in scenarios such as:
● You are remote and cannot reseat the node.
● Node was not removed from the chassis.
● Embedded module, I/O module, or 4-port card were replaced.
Steps
1. Launch an SSH client, and connect to the appliance using the management IP address. Since only the peer node is powered
on, you are connected directly to the peer node of the appliance.
2. Enter the username and password that is associated with the service account, and log in.
3. Run the following command:
svc_node power_on
4. Wait for the node to power on.
NOTE:
It may take several minutes for the node to power on.
Power on a PowerStore T model node by reseating the node
About this task
Use the following procedure to power on (power up) a PowerStore T model node when it was removed from the chassis:
Steps
1. Reseat the node into the chassis.
The node will power on automatically.
Power control procedures
179

Advertisement

Table of Contents
loading

Table of Contents