Center-Mount Readyrail Installation - Dell PowerSwitch N3200-ON Series Installation Manual

Hide thumbs Also See for PowerSwitch N3200-ON Series:
Table of Contents

Advertisement

2. Attach one rail to the front post flange with two user-supplied screws, item 2.
3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two
user-supplied screws, item 3.
4. Repeat this procedure for the second rail.

Center-mount ReadyRail installation

This switch installation procedure is for the full-width N3200-ON/E3200-ON Series switches only.
NOTE:
Do not use this installation procedure for the compact N3208PX-ON switch.
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1. Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two
user-supplied screws, item 1.
40
N3200-ON/E3200-ON Series switch installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerswitch e3200-on series

Table of Contents