1U Tool-Less Mount Readyrails Installation - Dell PowerSwitch N3200-ON Series Installation Manual

Hide thumbs Also See for PowerSwitch N3200-ON Series:
Table of Contents

Advertisement

Figure 2. Separate rails

1U Tool-less mount ReadyRails installation

This switch installation procedure is for the full-width N3200-ON/E3200-ON Series switches only.
NOTE:
Do not use this installation procedure for the compact N3208PX-ON switch.
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1. Face the ReadyRails flange ears facing outward. Place one rail between the left and right vertical posts. Align and seat the
back flange rail pegs in the back vertical post flange.
The center extractions show how the pegs appear in both the square and nonthreaded round holes.
38
N3200-ON/E3200-ON Series switch installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerswitch e3200-on series

Table of Contents