One Ru Readyrails Installation - Dell PowerSwitch N3200-ON Series Installation Manual

Hide thumbs Also See for PowerSwitch N3200-ON Series:
Table of Contents

Advertisement

ceiling mount

One RU ReadyRails installation

Install the N3200-ON/E3200-ON Series switch, excluding the N3208PX-ON switch, using one of the following installation
instructions.
You can install the ReadyRails system using the 1U tool-less square-hole method or one of three possible 1U threaded round-hole
methods. The tooled installation methods include two-post flush mount, two-post center mount, or four-post threaded mount.
NOTE:
You must order the ReadyRails mounting supplies for this installation separately.
To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail.
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
N3200-ON/E3200-ON Series switch installation
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerswitch e3200-on series

Table of Contents