15.
Torque the nut to 8 to 9 N∙m (71 to 80 in-lb),
loosen it, then torque it to 2 to 3 N∙m (20 to 25
in-lb).
Note:
Make sure that the axle does not extend
beyond either nut.
16.
Install the seal guards over the wheel hub and
insert the wheel into the caster fork.
17.
Install the caster bolt and tighten the nut fully.
Important:
To prevent seal and bearing damage,
check the bearing adjustment often by spinning
the caster wheel. The wheel should not spin freely
(more than 1 or 2 revolutions) or have any side
play. If the wheel spins freely, adjust the torque
on the spacer nut until there is a slight amount of
drag, then apply thread-locking adhesive.
Electrical System
Maintenance
Using the
Battery-Disconnect Switch
1.
Park the machine on a level surface, disengage
the PTO, and move the motion-control levers
outward to the P
2.
Shut off the machine, remove the key, and wait
for all moving parts to stop before leaving the
operating position.
3.
Unplug the battery charger if it is connected.
4.
Turn the battery-disconnect switch to the O
O
position.
FF
1. Turn the switch to the O
position to de-energize the
machine electrically.
34
position.
ARK
Figure 47
2. Turn the switch to the O
FF
position to energize the
machine electrically.
or
N
g374778
N