4-2. Operation Panel Configuration
Three-Phase & Single-Phase
①
Main Circuit Breaker (MCB)
Operation Display
②
Power Switch
③
Operation Selector Switch
④
Breaker Trip Selector Switch
⑤
Warning Indicators
⑥
SCR Indicators
⑦
(Inside)
Speed Monitor (Engine Tachometer)
⑧
Available Output Monitor
⑨
Fuel Leak Detected Lamp
⑩
DEF Level
⑪
Glow Lamp
⑫
Voltage Selector Switch
⑬
Load Bank Control Switch
⑭
Generator Circuit Breaker (GCB)
⑮
11