Maintenance; Battery Pack Storage - BW Technologies MicroDock II User Manual

Automatic test and calibration station
Hide thumbs Also See for MicroDock II:
Table of Contents

Advertisement

To charge a detector in a charging docking module,
complete the following:
1.
Connect the ac adapter of the charger to the
CHARGE port on the station and then plug the cord
into the ac outlet. The charging LED briefly lights
red then green during the self-test. The light then
powers off.
2.
Deactivate the detector and insert into the charging
cradle (bottom first). The charging LED then lights
red.
Ensure the detector is inserted correctly onto the
contact pins.
3.
Allow the battery to obtain a full charge. A full
charge requires 2-4 hours, depending upon how
many docking modules are connected to the
station.
The charging LED turns green when charging is
complete.
The charging LED powers off when the detector is
removed from the charger.

Maintenance

a Warning
No user-serviceable parts inside.
To maintain the station in good operating condition, perform
the following basic maintenance as required.
To ensure quality product operation, maintain a log of all
maintenance that is performed.
Clean the exterior with a soft, damp cloth. Do not use
solvents, soaps, or polishes.
Confirm that the inlet filter is free of dirt and replace it if
required. To order replacement parts, refer to
Replacement Parts and
Do not immerse the station in liquids.

Battery Pack Storage

(GasAlertMicro, GasAlertMicro 5, and GasAlertMicro 5 PID)
When storing for extended periods of time, ensure that the
detector is fully charged and recharged every 30 days.
MicroDock II
Maintenance
Accessories.
69

Advertisement

Table of Contents
loading

Table of Contents