Initializing The New Docking Module; Pump Setup - BW Technologies MicroDock II User Manual

Automatic test and calibration station
Hide thumbs Also See for MicroDock II:
Table of Contents

Advertisement

MicroDock II
Users Manual
1.
Deactivate the station.
2.
Remove the power cord from the POWER port.
3.
Remove the end plate. There are three Phillips
screws on the front and three Philips screws on the
back.
4.
Attach the new docking module.
5.
Ensure the barbed fitting ports mate correctly with
the gasket block. Ensure that the male and female
PCB connectors mate correctly.

Initializing the New Docking Module

When a new docking module is connected, it must
be initialized (setup to communicate with the
station).
6.
Activate the station.
Simultaneously press and hold C BUMP CHECK
7.
on the new docking module while pressing
C (leftmost button) on the station.
8.
All of the LEDS on the new docking module light.
On the station, the following screen displays to
confirm that the new docking module has been
successfully added.
22
Press C Ok to save the setting.
9.
10. Deactivate the station.
a Warning
The station must be deactivated after each module has
been added.

Pump Setup

The pump speed must be set for each new docking module
that is connected.
a Warning
Perform the pump setup procedures in a clean
atmosphere only.
11. Reactivate the station and wait until the normal
operating screen displays.
12. Connect the hose to a flow meter and to inlet 1
(PURGE) on the station.
Allow the flow meter sufficient time to stabilize
(approximately 30 minutes) before using to ensure
accurate flow readings.

Advertisement

Table of Contents
loading

Table of Contents