Unpacking The Appliance - Worcester Greenstar Ri Compact ErP Installation, Commissioning And Servicing Instructions

Wall hung rsf gas fired condensing regular boiler
Table of Contents

Advertisement

INSTALLATION
4.
Fig. 22 Marking the flue position
5.3

Unpacking the appliance

1. Remove outer carton (1) and place safely away from the working
area.
2. With the outer packaging removed and the inner sleeve (2) can be
removed.
3. Remove the protective wrapping (4) from the boiler.
4. Lie the boiler on the floor and discard the packing base (3).
CAUTION: Hanging the boiler
▶ Remove the plastic bungs fitted to pipes before
hanging the boiler.
1.
Fig. 23 Remove outer carton
24
1.
3.
2.
1
2.
2
3
3.
4
3
Fig. 24 Remove packaging
1. Outer carton
2. Inner sleeve
3. Packing base
4. Protective wrapping
5. Primary flow and return water pipes
Removing the outer case
▶ Before the case can be remove the control panel must be moved into
the service position, i.e. swivelled down.
1. Unscrew the retained catches securing the fascia.
2. Pull the catches towards you to release the panel.
3. Pull the fascia towards you slightly and then lift and pull forward to
swivel down into the service position.
4. Ensure that the control panel is in the service position i.e. swivelled
down.
5. Release the two screws securing the lower part of the case.
6. Release the spring clips at the top of the boiler.
7. Slide the case off the frame and place safely away from the working
area.
Greenstar Ri Compact
4.
5
5.
ErP
6720813282 (2015/07)

Advertisement

Table of Contents
loading

Table of Contents