Finishing commissioning

6.7.1

Replacing the outer case

1. Replace outer casing.
2. Ensure that the securing clips on top of the case are properly located.
3. Tighten bottom two screws (2).
4. Raise the control panel and engage the lugs on the top of the control
panel with the chassis.
2.
1.
3.
4.
5.
6.
Fig. 52 Fitting case
6.7.2

Securing the control panel

5. Push the control panel in to engage the catches at the bottom of the
panel.
6. Hand-tighten the two screws to secure the panel.
Greenstar Ri Compact
ErP
6720813282 (2015/07)
6.7.3

Fitting the fascia flap

1. Rotate the hinge to be in-line with the flap and present the flap
assembly up to the fascia.
2. Push the pegs on the hinge into the slots in the front of the fascia and
close the flap.
3. Secure flap to the fascia with the two screws provided.
2.
Fig. 53 Fitting fascia flap
6.7.4

Installing the bottom panel

1. The bottom panel slides onto two ledges either side of the boiler
frame.
2. Hold the panel up against the underside of the boiler, align the tabs
with the slots and slide towards the rear, until there is no more
movement.
3. Ensure that the two catches are fully engaged.
2.
3.
Fig. 54 Bottom panel installation